Upon evaluating the heating unit, we found it operational but identified a potential nuisance trip, likely due to high winds. We increased the thermostat by 2 degrees, ensuring the system satisfied and shut off properly before we left. Additionally, we confirmed that the blower and inducer amps were within specifications and that the gas pressure was optimal.